42 USC 1962d14a - Alaska hydroelectric power development

(a) Congressional findings and declaration 

(1) The Congress finds that the expeditious development of hydroelectric power generating facilities in Alaska that are environmentally sound to assist the Nation in meeting existing and future energy demands is in the national interest.
(2) The Congress therefore declares that the expertise of the Chief of Engineers can and should be utilized for the benefit of local public bodies in the development of projects which yield 90 per centum or more of the benefits of the project are attributable to hydroelectric power generation when the project is fully operational.
(b) Establishment of fund; composition 
To meet the goals of this section, there is hereby established in the Treasury of the United States an Alaska Hydroelectric Power Development Fund (hereafter referred to as the fund) to be and remain available for use by the Secretary of the Army (hereinafter referred to as the Secretary) to make expenditures authorized by this section. The fund shall consist of
(1)  all receipts and collections by the Secretary of repayments in accordance with subsection (e) of this section and payments by non-Federal public authorities to the Secretary to finance the cost of construction of projects in accordance with subsection (f) of this section, and which the Secretary is hereby directed to deposit in the fund as they are received, and
(2)  any appropriations made by the Congress to the fund.
(c) Authorization of appropriation 
There is authorized to be appropriated to the Secretary for deposit in the fund established by subsection (b) of this section the sum of $25,000,000.
(d) Investments; deposits 

(1) If the Secretary determines that moneys in the fund are in excess of current needs, he may request the investment of such amounts as he deems advisable by the Secretary of the Treasury in direct, general obligations of, or obligations guaranteed as to both principal and interest by, the United States.
(2) With the approval of the Secretary of the Treasury, the Secretary may deposit moneys of the fund in any Federal Reserve bank or other depository for funds of the United States, or in such other banks and financial institutions and under such terms and conditions as the Secretary and the Secretary of the Treasury may mutually agree.
(e) Expenditures for phase I design memorandum stage of advanced engineering and design; withholding of favorable report to Congress prior to repayment; expenditures from non-Federal funds 
The Secretary is authorized to make expenditures from the fund for the phase I design memorandum stage of advanced engineering and design for any project in Alaska that meets the requirements of subsection (a)(2) of this section, if appropriate non-Federal public authorities, approved by the Secretary, agree with the Secretary, in writing, to repay the Secretary for all the separable and joint costs of preparing such design memorandum, if such report is favorable. Following the completion of the phase I design memorandum stage of advanced engineering and design under this subsection, the Secretary shall not transmit any favorable report to Congress prior to being repaid in full by the appropriate non-Federal public authorities for the costs incurred during such phase I. The Secretary is also authorized to make expenditures from non-Federal funds deposited in the fund as an advance against construction costs.
(f) Authorization to construct projects; expenditures 
In connection with water resources development projects which meet the criteria established by subsection (a)(2) of this section and which are to be constructed by the Secretary, acting through the Chief of Engineers, in accordance with an authorization by Congress and a contract between the non-Federal public authorities and the Secretary, pursuant to subsection (g)(1) of this section occurring on or subsequent to October 22, 1976, the Secretary, acting through the Chief of Engineers, is authorized to construct such projects including activities for engineering and design land acquisition, site development, and off-site improvements necessary for the authorized construction by making expenditures from
(1)  the Fund established in subsection (b) of this section of funds deposited by non-Federal public authorities as payments for construction and
(2)  payments of non-Federal public authorities held by the Secretary as payment of construction costs for a project authorized by this section.
(g) Agreement with non-Federal public authorities and submittal to Congressional committees, payment of total non-Federal obligations; conditions of United States assumption of excess over costs fixed in agreement, payment subject to appropriations acts 

(1) Prior to initiating any construction work under the authorities of this section, the Secretary and the appropriate non-Federal public authorities shall agree in writing, and submit such agreement to the Committees on Environment and Public Works and on Appropriations of the Senate and the Committees on Public Works and Transportation and on Appropriations of the House of Representatives for review and reporting to the Congress for its consideration and approval that the appropriate non-Federal public authorities will pay the full anticipated costs of constructing the project at the time such costs are incurred, together with normal contingencies and related administrative expenses of the Secretary, and such payments shall be deposited in the fund or held by the Secretary for payment of obligations incurred by the Secretary on an authorized project under this section. The agreement shall provide for an initial determination of feasibility and compliance by the project with law. The total non-Federal obligation shall be paid on or prior to the date the Chief of Engineers has estimated by agreement, that the project concerned will be available for actual generation of all or a substantial portion of the authorized hydroelectric power of the project.
(2) In consideration of the obligations to be assumed by non-Federal public authorities under the provisions of this section and in recognition of the substantial investments which will be made by these authorities in reliance on the program established by this section, the United States shall assume the responsibility for paying for all costs over those fixed in the agreement with the non-Federal public authorities, if such costs are occasioned by acts of God, failure on the part of the Secretary, acting through the Chief of Engineers, to adhere to the agreed schedule of work or a failure of design: Provided, That payments by the Secretary of such costs shall be subject to appropriations acts.
(h) Conveyance of title, rights, and interests of United States; Federal requirements, reservations, and provisions 
The Secretary is authorized and directed, pursuant to the agreement, to convey all title, rights, and interests of the United States to any project, its lands and water areas, and appurtenant facilities to the non-Federal public authorities which have agreed to assume ownership of the project and responsibility for its performance, operation, and maintenance, as well as necessary replacements in accordance with this section upon full payment by such non-Federal public authorities as required under subsection (g)(1) of this section. Such conveyance shall, pursuant to the agreement required by subsection (g) of this section, to the maximum extent possible, occur immediately upon the projects availability for generation of all or a substantial portion of the authorized hydroelectric power of the project, and shall include such Federal requirements, reservations, and provisions for access rights to the project and its records as the Secretary finds advisable to complete any portion of project construction remaining at the time of conveyance and to assure that the project will be operated and maintained in a responsible and safe manner to accomplish, as nearly as may be possible, all of the authorized purposes of the project including, but not restricted to, hydroelectric power generation.
(i) Short title 
This section shall be cited as the Alaska Hydroelectric Power Development Act.